Skip to main content

Posts

Showing posts with the label Bus Bar Schemes

One & Half Breaker Arrangement - Substation design (Bus Bar Schemes)

In this scheme, three circuit breakers are used for controlling two circuits which are  connected between two bus bars. Normally, both the bus bars are in service. A fault on any one of the bus bars is cleared by opening of the associated circuit breakers  connected to the faulty bus bar without affecting continuity of supply. Similarly, any circuit  breaker can be taken out for maintenance without causing interruption. Load transfer is  achieved through the breakers and, therefore, the operation is simple. However, protective  relaying is somewhat more involved as the central (tie) breaker has to be responsive to  troubles on either feeder in the correct sequence. Besides, each element of the bay has to be  rated for carrying the currents of two feeders to meet the requirement of various switching  operations which increases the cost. The breaker and a half scheme is best for those  substations which handle large quantities...